The Draft Charging Schedules for Christchurch and East Dorset were available for public consultation from 7 May until the 18 June 2014.
Thank you for the comments received. The consultation document is still available to view:
Evidence Studies supporting the consultation document include:
- Christchurch and East Dorset Community Infrastructure Viability Testing June 2013
- Christchurch Urban Extension Viability Reports
- East Dorset New Neighbourhoods Viability Report
- Responses to the Preliminary Draft Charging Schedule
- Analysis of the Responses to the Preliminary Draft Charging Schedule
The Statement of Representations Procedure summarised where copies of the documents were available for inspection.
This was the second of two consultations; the first on the Preliminary Draft Charging Schedule was undertaken in January 2013.