Weather disruption
Winter weather is causing disruption to services in some parts of the county. Find out what services may be affected in your area.
Dorset Council is responsible for approximately 3,795 km of carriageway, and is committed to managing skid resistance levels of road surfaces across this network to achieve acceptable road user safety in a cost-effective manner.
The maintenance of adequate levels of skidding resistance on carriageways, footways and cycle routes is a most important aspect of highway maintenance, and one that contributes significantly to network safety.
Skid resistance can be improved at relatively low cost and provides substantial benefits to communities, making this aspect of highways maintenance a cost-effective use of Council resources.
This Skid Resistance Strategy and Operational Guidance sets out the Council’s approach to managing skid resistance levels of road surfaces across the Council’s highway network and provides detailed guidance for the processes by which the strategy will be applied.
This document has been produced in conjunction with Yotta’s Infrastructure Asset Management Consultancy team.
Skid resistance is a measure of the frictional properties between the tyre of a moving vehicle and the road surface which directly affect the ability of a driver to slow / stop the vehicle.
As such, it is a key component of road safety. In this document, skid resistance is considered in wet conditions, since the skid resistance of a wet or damp road surface can be substantially lower than the same surface when dry.
The skid resistance of a surface decreases over time due to the effects of traffic and weathering.
Routine monitoring of skid resistance is carried out annually across the network using a Sideways-force Coefficient Routine Investigation Machine (SCRIM) to provide an average deficiency measurement known as the Characteristic Skid Coefficient (CSC), and combined with other data to determine areas for further investigation and potential treatment.
This Skid Resistance Strategy provides the framework, processes and guidance for the management of skid resistance, with the aim of ensuring that the frictional properties of road surfaces are appropriate for their expected use and safety risk.
The operational guidance describes the detailed processes to:
The safety benefits of effective skid resistance management are:
Non-safety-related benefits of effective skid resistance management include:
We can measure how effective we have been through monitoring and reporting on :
This document is based on guidance in the UK Design Manual for Roads and Bridges (DMRB), – CS 228: Skidding Resistance (formerly HD 28/15). CS 228 is designed for application to the UK Strategic Road Network rather than a local authority network such as Dorset.
As such, some aspects of this strategy deviate from CS 228 guidance to ensure that desired outcomes are maintained and that the strategy is practical for the Council’s purposes.
Deviations from CS 228 are noted and justified throughout this document, and are made only where there is a clear benefit and safety risk is considered to remain acceptable.
This Strategy is also written in accordance with the relevant principles defined in the 2017 UKRLG Code of Practice (Well-Managed Highway Infrastructure), in particular section B.5.6
Significant changes to any of the standards/guidance referred to above will result in a review of the relevant parts of this Strategy.
Ensuring safe levels of skid resistance is not a specific legal requirement on local authorities. However, maintaining highways to an acceptable level of safety supports the fulfilment of the duties of Highways Authorities under the Highways Act 1980.
In addition, it is general good practice and clearly desirable to maintain acceptable skid resistance.
In line with the general principles of the UKRLG Code of Practice and CS 228, this Strategy applies a risk-based approach to the management of skid resistance, including:
This Skid Resistance Strategy applies to carriageways only. Off-carriageway skid resistance (e.g.: cycle paths, slip resistance for pedestrians) is managed separately by other processes that the Council has in place.
The following sources of guidance may be referenced where relevant for particular road users:
Note that the skid resistance of cycleways located on carriageways will be managed in the same way as for the adjoining carriageway (therefore will be maintained to the same standard of skid resistance.
The following process provides an overview of the process behind the Council’s Skid Resistance Strategy. Each of these steps is detailed further in the relevant sections of the Strategy.
This process flow has built-in review loops – these are detailed throughout this document in the relevant sections.
This Strategy employs a risk-based approach throughout. Some key risk-based steps are summarised in below using site risk scores.
The SCRIM survey network is that part of the highway network on which skidding resistance will be managed according to this strategy. The Council have defined their SCRIM network as all A and B roads and some C roads on their adopted highway network
CHART
Skid resistance surveys will not be routinely undertaken on parts of the network other than the SCRIM survey network.
Skid resistance measurement of sites not on the SCRIM survey network may be undertaken when requested by the maintenance engineer as a result of reported incidents.
Where possible, such sites will be appended to the routine annual SCRIM survey programme.
These sites will be reviewed to determine whether they should be added directly to the SCRIM survey network in future years.
Details of the SCRIM survey network (including Site Categories and corresponding Investigatory Levels – see below) shall be maintained in appropriate formats and stored using appropriate methods, including within the Council’s highways asset management systems.
These details shall be provided to SCRIM surveying contractors prior to every annual survey.
The SCRIM Survey Network will be regularly reviewed as part of the whole strategy review, and/or in the following specific cases:
The SCRIM Network is divided into sections, called Site Categories, based on the broad characteristics of the section in relation to skidding incident risk, considering both the likelihood and potential consequences of a skidding incident.
The Council’s criteria for setting Site Categories are identical for the most part to those in CS 228.
The resulting full list of Site Categories applied to the Council’s SCRIM survey network is as follows:
Mini-roundabouts should be excluded from this Site Category. Category Q should be applied for the approach to and across mini roundabouts.
Categories G1 and G2 are not applicable to uphill gradients on carriageways with one-way traffic.
Site Categories will be applied to the entire SCRIM survey network according to the criteria set out above, and the following general principles:
Site Categories shall be set based on the guidance in this strategy in conjunction with the detailed guidance in CS 228 (NB: the differences between the Site Categories specified in this strategy and those specified in CS 228 should be considered).
Site Categories will be regularly reviewed as part of the whole strategy review, and/or in the following specific cases:
Investigatory Levels (ILs) represent a pre-defined limit below which investigation may be required: above this limit, skid resistance is considered to be satisfactory; at or below this limit skid resistance may require further investigation.
Investigatory Levels shall be set for each part of the SCRIM survey network – one value shall be set for each individual site, based on its Site Category. These shall be set by suitably qualified and experienced persons only, based on the guidance in this document and in CS 228.
A range of possible ILs is given for each Site Category to account for the fact that skidding risk may vary between sites of the same Site Category. These ranges are set according to the relative skidding risk judged to be inherent to each Site Category. The predefined ranges for setting ILs according to Site Category are shown below in Table 2 (where L/S/H = Low/Standard/High risk).
These ranges are identical for the most part to those in CS 228, however, additional “Low” IL values (noted as L* in Table 2) are available for categories R and G1 to account for the specificities of Dorset’s SCRIM survey network (including accounting for the additional Site Category S2b as described in 3.2):
The default IL applicable to each site is the Standard (S) value given in Table 2 for the relevant Site Category. This may be varied within the applicable range given in Table 2 if the site is considered to be higher/lower risk than usual – see the notes below Table 2 for some such cases.
The detailed guidance on setting ILs given in CS 228 will be the main reference point in this process (NB: the differences between the Site Categories/ILs specified in this strategy and those specified in CS 228 should be considered).
Investigatory Levels will be applied to each individual site on the SCRIM survey network according to the criteria set out here, in CS 228, and in 3.4 below. Each site shall have only one IL applied to it. If it appears that more than one IL could apply, the highest value shall be chosen.
Investigation Levels will be regularly reviewed as part of the whole strategy review, and/or in the following specific cases:
Individual sites on the SCRIM survey network shall be defined in order to allow meaningful comparison with an average CSC, (see Calculation of the Characteristic Skid Coefficient section) across the site. Individual sites shall be defined as follows:
NB: these same criteria will apply to sites with the Roundabout (R) Site Category, although CS 228 specifies 10m site lengths on roundabouts. Given the size and layouts of the majority of roundabouts on a Local Authority network, the general site length criteria given above will be suitable. Using 10m sections on roundabouts provides little/no benefit on a Local Authority network, while greatly multiplying the number of sites to manage.
Skid resistance for routine surveys will be measured using a SCRIM (Sideways-Coefficient Routine Investigation Machine).
Exceptionally, alternative measurement systems may be used for the sole purpose of detailed investigation of local sites (see Detailed Site Investigations section) if the Council is satisfied that the system is suitable for purpose and operators are suitably qualified and experienced. Skid resistance will be measured annually over the entire SCRIM survey network (as defined in the The SCRIM Survey Network section).
Surveys will be planned in accordance with the Single Annual Skid Survey (SASS) approach as defined in CS 228.
This specifies that, over a 3-year cycle, each road length on the SCRIM survey network shall be tested once in each part of the survey season: Early, Middle and Late.
The survey season for Dorset Council is defined as 1st May to 30th September of each year, and is divided into three parts as follows:
Add table
The SASS approach has been selected by the Council as it is deemed to be the most cost-effective, and allows for full coverage of the SCRIM survey network each year.
SCRIM surveys shall be carried out by a suitably qualified and experienced contractor, with equipment conforming to the general characteristics of British Standard BS7941-1.
SCRIM surveys shall be undertaken in accordance with clauses 3.2 to 3.9 of CS 228 – refer to these clauses for detailed information.
Any deviations from these clauses must be clearly agreed between the Council and the surveying contractor, and documented.
Processing of raw SCRIM survey data to produce Skid Coefficient (SC) values shall be undertaken in accordance with clauses 3.20 to 3.24 of CS 228 – refer to these clauses for detailed information.
This processing will generally be undertaken by the surveying contractor – if so, this should be specified in their contract.
The surveying contractor shall deliver survey data of content and format to be agreed during the procurement process.
Delivery shall include a survey coverage report detailing the network that was to be surveyed, lengths with missing or invalid data, and an explanation for any missing data.
Raw and processed data from SCRIM surveys shall be stored in accordance with the Council’s Data Management policies.
Relevant processed data shall be uploaded to Yotta’s Horizons strategic asset management system for use in site investigation prioritisation, skid resistance-related works programming, and for general viewing of the data.
The Skid Coefficient (SC) is the measurement of skid resistance which is produced by the SCRIM survey.
The SC must be corrected to account for seasonal variations in skid resistance – the corrected SC is known as the Characteristic Skid Coefficient (CSC).
Once raw survey data has been loaded, checked and processed, seasonally-corrected CSC values shall be calculated from the SC values following the SASS approach defined in CS 228.
The mean CSC of each site shall be calculated according to the relevant averaging length.
All sites where the measured CSC is at or below the corresponding IL shall undergo the initial site risk assessment process as described below.
Identification of sites at which there is a SCRIM deficiency will be undertaken as soon as is reasonably practical, and within no more than six weeks from receipt of all relevant processed data.
Other sites may be put forward for initial risk assessment where increased skidding crash levels have been observed.
The objective is to provide a risk assessment of these sites with regards to the risk of a skidding incident.
This risk assessment will enable prioritisation of sites for detailed onsite investigations.
Risk assessment will be carried out using the risk-based site scoring system in the Risk-based site scoring system below – this is taken directly from HD 28/15 (Table A.7.1, Annex 7) with the only deviation being the texture score.
Although HD 28/15 has been superseded by CS 228 the risk-based scoring system below is still relevant and in line with Code of Practice.
The Risk-based site scoring system must be used in conjunction with the accompanying guidance notes.
Indicative likely impact of a crash by Site section provides an initial guideline for determining the likely impact of a crash based on the applicable Site Category, for use in the risk assessment. Other factors which relate to risk such as speed limit, road classification and traffic levels are considered when defining Site Categories and IL’s, as detailed in the corresponding sections above.
0
0
1
4
2
8
3+
12
slight
1
slight/serious
2
serious
3
serious/fatal
4
0
0
between 0 and 0.05
1
between 0.05 and 0.10
3
between 0.10 and 0.15
6
between greater than 0.15
12
Number of crashes refers to the total number of personal injury crashes. Wet and wet skid crash counts are not considered separately here and should be investigated during the detailed investigation of the site. To account for possible inaccuracies in the recording of collision locations, analysis will extend over a length of road extending 100m in each direction from recorded collision locations. All road traffic collision incident data will be validated before being used in analysis to ensure there is no duplication
Likely impact of a crash shall be assessed on an individual site basis where required. This is explained in the next section, Indicative likely impact of a crash by Site Category
SD calculation is SD = CSC – IL. Where the site has multiple SD values the lowest value should be used
B Non-event carriageway with one-way traffic
Slight
C Non-event carriageway with two-way traffic
Serious/fatal
Q Approaches to and across minor and major junctions. Approaches to roundabouts and traffic signals.
Serious/fatal
K Approaches to pedestrian crossings and other high-risk situations
Serious/fatal
R Roundabouts
Slight
G1 Gradient of 5-10% longer than 50m
Slight/serious
G2 Gradient of >10% longer than 50m
Serious
S1 Bend radius <500m – carriageway with one-way traffic
Slight
S2 Bend radius <500m – carriageway with two-way traffic
Serious/fatal
Note: the likely crash impacts given are indicative only. Where the characteristics of an individual site warrant it, a specific assessment of likely crash impact should be undertaken
Following this initial risk assessment, sites will be ranked in order of descending risk.
Detailed site investigations will be carried out at all sites with a risk score of 18 or greater, as determined by the system set out in this section.
This threshold is higher than that set out in HD 28/15 for mandatory detailed site investigations (HD 28/15 threshold = 6).
The increased threshold is to account for the more limited resources of a local authority (as compared to National Highways) while still balancing safety risks, and was determined by assessing various scenarios using potential combinations of the criteria in the Risk-based site scoring system.
For example, a site with a “serious/fatal” likely crash impact and a skid resistance difference of between -0.10 and -0.15 would be assigned a risk rating of 10, i.e.: over the upper threshold of 9.
All other sites flagged for potential investigation (i.e. with risk scores between 18-23) should undergo detailed site investigations on a risk-prioritised basis, as far as resources will allow, in descending order of risk-ranking, i.e. higher risk sites have a higher priority for investigation.
All sites selected for detailed investigations following the initial risk assessment process as described in the previous section will be passed on to the person(s) responsible for coordinating these investigations.
A schedule of investigations will be planned out in such a way as to undertake the work in as timely and efficient a manner possible – investigations should be carried out according to initial risk assessment:
Site investigations must be undertaken by a competent person in highway maintenance, using the Site Investigation Form in B (designed with reference to CS 228), and referring to the detailed guidance notes.
Prior to going on site, the investigator should gather all relevant information as far as is practical, and pre-fill the Site Investigation form where possible.
The following list provides a guide for information to be gathered prior to going on site:
Site investigations may be carried out on foot or from a vehicle – the decision shall be made based on factors such as assessed site skid risk, resources and/or time available, health and safety risks to inspectors, and prior knowledge of the site. In general, it is preferable for the investigator to walk the site in order to get the most detailed results, especially if skid risk is high.
In rare circumstances, detailed site investigations may be carried out without physically going on site, however this must be robustly justified – for example, due to health and safety risks. In these cases, the investigator should use (recent) photos/videos of the site wherever possible.
The Health and Safety of personnel conducting site investigations, maintenance operatives and other road users is paramount. As such, site investigations shall be undertaken in a manner that minimises risk to these groups. Health and safety risks should be managed in accordance with the Council’s usual procedures.
During on-site investigations, the investigator(s) should take photos to illustrate/record key information where relevant, and include these in the investigation report. A camera with geo-referencing should be used when possible.
As a result of the investigation, remedial actions to address skid resistance risk at the site may be recommended by the investigator(s). These will be clearly noted on the Site Investigation form, and addressed according to the approach set out in the following sections.
Post-investigation, an investigation report for each site shall be produced including:
Records of all site investigations and ensuing reports (including additional data/documentation) will be retained for five years.
Site investigations may result in the need for various actions.
These may include actions to reduce skid resistance risk (e.g.: pavement works, improving signage, etc.) – these are covered in these sections.
The inspector may also recommend changes to the site IL and/or risk rating based on risk factors observed at the site.
In these cases, a review will be undertaken, considering the site investigation report and inspector recommendations, to determine whether the site IL and/or risk rating should be changed, and to what value(s).
Site investigations may also result in an outcome of “no action required”.
These sites should be picked up by the process in the following year since they will have SD ≤0 – in this way their skid risk will be continually monitored.
All such reviews will be documented and records maintained.
Where the site risk rating is changed following any review, this post-investigation risk rating will be applied for the purposes of determining the priority of remedial actions.
Note that a change to the IL may affect site risk rating whether/not the risk rating is changed directly. All site investigation outcomes will be reviewed and approved by a suitably qualified and experienced person – this person will sign off the investigation form.
If, following detailed site investigation, the condition of the road surface is considered to be a contributory factor to unacceptable skid resistance at the site, it may be necessary to plan works to remedy this.
These works will generally fall into one of three categories:
The type of treatment (and extent, depth, etc.) will be decided by suitably qualified and experienced personnel, taking into consideration any recommendations from the site investigator(s).
Scheme design is not covered in this document. Scheme design will follow all the usually applicable Council processes, and conform to all applicable standards and guidance.
The programming and prioritisation of remedial works will be risk-based (using post-investigation site risk scores) as follows:
Subject to the conditions above, works will be prioritised where necessary in order of descending skid risk in accordance with their post-investigation risk score.
Works will be programmed in as part of the usual works programming processes – this will allow potential efficiencies to be identified where synergies are available between works to improve skid resistance and general maintenance works to improve road condition.
In addition to/as an alternative to pavement condition improvement, several non-invasive options for reducing skid risk may be recommended following site investigation.
These include:
Where such actions are recommended in a Site Investigation report, they should be implemented according to the post-investigation risk rating:
Actions can be prioritised within categories by descending risk rating where necessary.
“Slippery road” warning signs shall be installed at all sites for which the site investigation identified a need for treatment to improve skid resistance.
The urgency of installing warning signs will depend on the site’s post-investigation risk rating:
Once the location of sites requiring warning signs has been identified, a schedule for installation shall be produced.
While drawing up the schedule, the skid resistance at the location of all currently installed slippery road warning signs shall be reviewed to determine whether signs are still needed.
This review should occur at least annually.
Once completed the schedule for warning signs shall be updated to also include currently installed signs which require removal.
The Slippery Roads warning sign in conjunction with an appropriate supplementary plate will be used in accordance with the Traffic Signs Regulations and General Directions, and Chapter 4 of the Traffic Signs Manual.
Note that slippery road warning signs shall not be used in connection with newly-laid asphalt road surfacing materials (see CS 228 section 7).
Warning signs shall be removed as soon as reasonably practical after treatment has been applied and maintenance engineers are satisfied that skid resistance levels are acceptable.
A visual inspection of sites shall be made after signs are installed/removed to confirm that they have been correctly installed/removed, and a record of these inspections shall be made and retained.
An inventory of all slippery road signs installed/removed as part of this process shall be recorded and retained.
This inventory will include details of sign locations, date of installation/removal, and details of related works orders.
Skid resistance is a measure of the frictional properties between the tyre of a moving vehicle and the road surface which directly affect the ability of a driver to slow / stop the vehicle. As such, it is a key component of road safety.
The skid resistance of a surface decreases over time due to the effects of traffic and weathering. Routine monitoring of skid resistance is carried out annually across the network using a Sideways-force Coefficient Routine Investigation Machine (SCRIM) to provide an average deficiency measurement known as the Characteristic Skid Coefficient (CSC), and combined with other data to determine areas for further investigation and potential treatment.
Dry, clean road surfaces achieve a high and generally consistent skid resistant level whereas the same surface when wet or damp can produce a significantly lower skid resistance level. For this reason, measurements of skid resistance are made on wetted road surfaces.
Wearing of road surface materials caused by weathering and commercial vehicle damage can significantly reduce skid resistance performance when the road is wet or even damp. By managing the risk of skidding accidents in wet conditions we equalise the risk across the road network.
This is achieved by providing a level of skid resistance to a section of road based on a risk analysis using accident records, road layout and engineering experience.
Research by TRL demonstrates that the risk of a wet-road skidding accident increases as skid resistance decreases.
However, the secondary nature of skid resistance as an accident factor means that the relationship between skid resistance and accident risk is not a precise one.
The level of skid resistance is dependent on two road surface parameters: the micro-texture, which is the surface roughness of the aggregate in the road; and the macro-texture, which is the surface texture at a higher level.
Micro-texture is the main contributor to skid resistance at low speeds of less than 50 km/h (30mph) whilst macro-texture generates friction by deforming the tyre and providing a drainage route between tyre and road surface helping to prevent aquaplaning. Macro-texture is a more important factor for wet skidding resistance at speeds of greater than 65 km/h (40 mph).
Skid resistance fluctuates through seasonal weathering and polishing cycles.
During the winter period – defined here as October to March – the roads are often wet, and gritty road detritus roughens the micro-texture, causing the skid resistance to rise. In the summer period – defined here as April to September – the roads are generally dry and road detritus is mainly dusty, so the road surface becomes polished and the skid resistance falls.
In practice, the minimum skid resistance will vary from year to year and within year depending on weather conditions.
The Single Annual Skid Survey (SASS) approach to skid resistance measurement, as detailed in CS 228, has been developed to allow for this seasonal variation in skid resistance.
Within normal ranges, low skid resistance may be a significant contributory factor to collisions.
The level of skid resistance, even on a polished surface, will generally be adequate to achieve normal acceleration, deceleration and cornering manoeuvres on sound surfaces that are wet, but free from other contamination.
However, higher skid resistance can allow manoeuvres that demand higher friction to be completed, e.g. to shorten stopping distance or to turn sharp corners.
Higher skid resistance can therefore reduce accidents in cases where drivers need to complete a more demanding manoeuvre in order to avoid an accident.
Accident analysis reveals that there are relationships between measured skid resistance and accident risk.
These relationships are not precise – the influence of skid resistance on accident risk is significantly different for roads with different characteristics. For this reason, site categories have been defined to group roads with similar characteristics.
For some site categories, the relationship between accident and skid resistance is tenuous. For other site categories progressively more accidents are observed as the skid resistance falls.
For these categories there are clear benefits in maintaining a higher level of skid resistance.
The ranges of Investigatory Levels (i.e.: acceptable minimum skid resistance) applied to each site category reflect this variation in skid resistance risk. Additionally, not all sites within a single category are equivalent in terms of their accident risk.
Judgement of the relative accident risk and appropriate level of skid resistance for different sites within the same category forms a key part of the effective operation of this strategy. Guidance in determining SCs and allocating ILs is provided in this document.
ADEPT - Association of Directors of Environment, Economy, Planning & Transport
BS - British Standard
CS CS228 - Skidding Resistance
CSC - Characteristic Skid Coefficient: an estimate of the skid resistance accounting for the effects of seasonal variation
DMRB - The Design Manual for Roads and Bridges
HD28 - DMRB 7.3.1: Skidding Resistance. (Superseded by CS 228)
IL - Investigatory Level: pre-defined limit of minimum acceptable skid resistance, applied to specific sites
SASS - Single Annual Skid Survey: a method of programming SCRIM surveys and processing their results to account for seasonal variations of skid resistance
SC - Site Category: categorisation of a site on the SCRIM network based on the characteristics of that site in relation to wet-skidding incident risk
SCRIM - Sideways-force Coefficient Routine Investigation Machine, used to perform skid resistance surveys
TRL - Transport Research Laboratory
UKPMS - United Kingdom Pavement Management System (the UK national standard for pavement management systems)
The Design Manual for Roads and Bridges. - Department For Transport
CS 228 Skidding Resistance - Department For Transport (LINK DOES NOT WORK)
Well-Managed Highway Infrastructure - Roads Liaison Group
Horses and Highway Surfaces - British Horse Society/ADEPT (formerly County Surveyors Society)
Guidelines for Motorcycling - Institute of Highway Engineers
Traffic Signs Regulations and General Directions - Department for Transport
This policy was last reviewed in 2021.
The next expected review date is 2024.