Weather disruption
Winter weather is causing disruption to services in some parts of the county. Find out what services may be affected in your area.
In 2022, Dorset Highways started work to build a shared use footway/cycleway between Station Roundabout and Saxon Roundabout.
The scheme will be built in phases and provide much-needed pedestrian and cycle access between the Northport area of Wareham and the town centre.
It will also link to the completed section of cycleway alongside the A351 between Saxon Roundabout and Worgret Roundabout, enhancing the sustainable travel options in the market town.
Funded by the Department for Transport ‘s Challenge Fund, this section of shared use path was built in early 2022 and is open for use.
This phase will take the footway/cycleway over the existing A351 road bridge between Wareham Roundabout and Saxon Roundabout to help link communities with the town centre.
There is currently no construction date for this section of cycleway.
The cycleway scheme does not seek to replace the Wareham Level Crossing, although it will help improve accessibility to the station when the level crossing is not in use.
The manned pedestrian level crossing operates between 6am and 1am (the following day), seven days a week.
Dorset Council is continuing to work with Network Rail on a long-term solution to the accessibility issues at the station, following the planning refusal in 2012 for ramped access to the existing bridge.