Weather disruption
Winter weather is causing disruption to services in some parts of the county. Find out what services may be affected in your area.
Milborne St Andrew Parish Council has asked for a traffic management scheme to be developed in line with the aspirations set out in the Neighbourhood Plan.
Our engineers are working with the parish to look at ways to improve the pedestrian environment and slow vehicles travelling through the village centre.
The parish council is looking to use developer contributions on a scheme to:
The traffic management scheme could include a combination of the following:
Work is ongoing to establish the exact details of any construction and lining work.
Following our review of the traffic management study, the parish has asked us to develop a design for a build-out adjacent to the pub to enhance the pedestrian environment while helping to manage traffic through the village centre.
Although traffic modelling has demonstrated that westbound priority running is possible, there is concern that a permanent installation would be difficult and costly to remove if unsuccessful or problematic.
For this reason, the system will be put in as a trial for three weeks in October 2024, where driver behaviour can be recorded and traffic data collected.
The temporary road layout will use traffic management features usually associated with roadworks; waterfilled inter-locking barriers and A-frame temporary signs, with the arrangement mimicking the proposed permanent build-out design to provide ‘real-time’ data.
The trial is intentionally taking place during half-term to gather data from a ‘normal’ commuting week and from ‘holiday traffic’ movements.
The data collected from the trial will help us make a decision regarding the effectiveness of the proposed permanent build-out feature.