This report is one of a series of topic based reports which together constitute the Christchurch and East Dorset Authorities’ Monitoring Report.
These reports will be regularly updated. The date that the information was last updated is indicated alongside each table/section as appropriate. Further topic areas can be viewed in the Christchurch and East Dorset Authorities' Monitoring Report page.
Contents:
- Residential completions
- Five Year Supply and Housing Trajectory
- Housing Delivery in the Christchurch Urban Extension and New Neighbourhoods
- Housing Densities
- Housing Design (last updated December 2016)
- Completed Affordable housing by Bedroom Number
- Affordable Completions - Green Field/Brown Field
- Affordable Housing Completions by Tenure
- Housing and Accommodation for Vulnerable People
Residential completions
The table below sets out net residential completions for Christchurch and East Dorset combined, against the local plan target set out in policy KS4: The data was taken from the Annual Residential Completions Survey.
Monitor indicator | 2012-13* | 2013-14* | 2014-15* | 2015-16* | 2016-17* | 2017-18 | Total 2012-18* | Strategic objective | Policy target (where relevant) |
---|---|---|---|---|---|---|---|---|---|
No. of completions excluding local plan new neighbourhoods | 132 |
305 |
332 |
318 |
428 |
280 |
1795 |
5 |
About 5000 |
No. of completions within the local plan proposed new neighbourhoods | 0 |
0 |
2 |
36 |
2 |
125 |
165 |
5 |
3,465 |
Total | 132 |
305 |
334 |
354 |
430 |
405 |
1960 |
5 |
8,490 2013 to 2028 - 566 a year |
*Net completions in Christchurch and East Dorset in financial years covering 1 April to 31 March.
Table last updated January 2019, using figures collected up to 31 March 2018
Five year supply and housing trajectory
East Dorset 2019/20 Five Year Housing Land Supply
Previously, Christchurch and East Dorset published a joint five year supply position reflecting the jointly adopted Local Plan covering the two former Dorset local authority areas. Since the formation of the unitary councils of Dorset Council and Bournemouth, Christchurch and Poole Council, the two former local planning authorities now form part of the larger unitary authorities.
Given the above position and to move towards the calculation of the five year housing land supply on the basis of the new unitary authorities, the Councils have taken the decision to produce separate five-year housing land supply figures for the former local planning authority areas of East Dorset and Christchurch.
For the period 2020 to 2025, the East Dorset area can currently demonstrate a supply of deliverable sites equivalent to 5.36 years. The calculation for this is available in the East Dorset Five-year housing land supply Report 2019/20, page 24, Figure 4.1.
East Dorset 2018/19 Five Year Housing Land Supply
For the period 2019 to 2024, East Dorset did not have a sufficient supply to meet the five-year supply requirement as required by national policy and can only demonstrate a supply of deliverable sites equivalent to 4.91 years. The calculation for this is available in the East Dorset Five-year housing land supply Report 2018/19, page 24, Figure 4.1.
Christchurch and East Dorset Core Strategy - 2017/18 Five Year Housing Land Supply
The Christchurch and East Dorset Core Strategy set a single housing delivery target of 8,490 dwellings for the 15 year period 2013 to 2028.
The Councils published their 5 year housing supply statement for the period 2018-2023 in December 2018. This was an interim document and will be updated as necessary when the Government publishes the results of the Housing Delivery Test. View the Five Year housing land supply - Christchurch and East Dorset.
The statement indicates that to meet the 5 year requirement plus a buffer of 5% based on the proposed housing delivery strategy in Policy KS4, 4,024 dwellings are required in Christchurch and East Dorset over the period 2018 to 2023. SHLAA Reports have identified land for 4,384 dwellings, which meets the requirement plus a buffer of 5% with 360 surplus dwellings. The statement also includes a trajectory showing anticipated delivery of housing against housing targets for the period 2018 to 2028.
Housing delivery in the Christchurch urban extension and new neighbourhoods
The tables below show progress to date in terms of residential completions on planned new neighbourhoods. The Coppins development was completed in 2015/2016 and the Holmwood House site is nearing completion, with construction with 2 dwellings being completed in 2016/2017 and a further 125 completed in 2017/2018.
Residential completions on new neighbourhoods (Christchurch and East Dorset)1 April 2014 -31 March 2015
Strategic objectives 1,2,5 and 7
Policy/neighbourhood | Site dwelling completions | Affordable housing completion | Percentage of affordable as proportion of total site completions | Site housing target |
---|---|---|---|---|
CN1 Christchurch urban extension |
N/A |
N/A |
N/A |
950 |
CN2 South of Burton village |
N/A |
N/A |
N/A |
45 |
WMC5 Cuthbury allotments and St Margaret's Close |
N/A |
N/A |
N/A |
220 |
WMC6 Stone Lane, Wimborne |
N/A |
N/A |
N/A |
90 |
WMC7 Cranborne Road, Wimborne |
N/A |
N/A |
N/A |
600 |
WMC8 South of Leigh Road, Wimborne |
N/A |
N/A |
N/A |
350 |
CM1 Lockyer's school & North of Corfe Mullen |
N/A |
N/A |
N/A |
250 |
FWP3 Holmwood House, Ferndown |
N/A |
N/A |
N/A |
150 |
FWP4 Coppins, Ferndown |
2 |
0 |
N/A |
40 |
FWP6 East of New Road, West Parley |
N/A |
N/A |
N/A |
320 |
FWP7 West of New Road, West Parley |
N/A |
N/A |
N/A |
150 |
VTSW4 North Western Verwood |
N/A |
N/A |
N/A |
230 |
VTSW5 North Eastern Verwood |
N/A |
N/A |
N/A |
65 |
Total completions |
2 |
0 |
N/A |
- |
Table last updated October 2016, using figures collected up to 31 March 2016
Residential completions on new neighbourhoods (Christchurch and East Dorset) 1 April 2015 to 31 March 2016
Strategic objectives 1,2,5 and 7
Policy/neighbourhood | Site dwelling completions | Affordable housing completions | Percentage of affordable as proportion of total site completions | Site housing target |
---|---|---|---|---|
CN1 Christchurch urban extension |
N/A |
N/A |
N/A |
950 |
CN2 South of Burton Village |
N/A |
N/A |
N/A |
45 |
WMC5 Cuthbury allotments and St Margaret's Close |
N/A |
N/A |
N/A |
220 |
WMC6 Stone Lane, Wimborne |
N/A |
N/A |
N/A |
90 |
WMC7 Cranborne Road, Wimborne |
N/A |
N/A |
N/A |
600 |
WMC8 South of Leigh Road, Wimborne |
N/A |
N/A |
N/A |
350 |
CM1 Lockyer's school & North of Corfe Mullen |
N/A |
N/A |
N/A |
250 |
FWP3 Holmwood House, Ferndown |
N/A |
N/A |
N/A |
150 |
FWP4 Coppins, Ferndown |
36 |
19 |
53% |
40 |
FWP6 East of New Road, West Parley |
N/A |
N/A |
N/A |
320 |
FWP7 West of New Road, West Parley |
N/A |
N/A |
N/A |
150 |
VTSW4 North Western Verwood |
N/A |
N/A |
N/A |
230 |
VTSW5 North Eastern Verwood |
N/A |
N/A |
N/A |
65 |
Total completions |
36 |
19 |
53% |
- |
Table last updated October 2016, using figures collected up to 31 March 2016
Residential completions on new neighbourhoods (Christchurch and East Dorset) 1 April 2016 to 31 March 2017
Strategic objectives 1,2,5 and 7
Policy/neighbourhood | Site dwelling completions | Affordable housing completions | Percentage of affordable as proportion of total site completions | Site housing target |
---|---|---|---|---|
CN1 Christchurch urban extension |
N/A |
N/A |
N/A |
950 |
CN2 South of Burton Village |
N/A |
N/A |
N/A |
45 |
WMC5 Cuthbury allotments and St Margaret's Close |
N/A |
N/A |
N/A |
220 |
WMC6 Stone Lane, Wimborne |
N/A |
N/A |
N/A |
90 |
WMC7 Cranborne Road, Wimborne |
N/A |
N/A |
N/A |
600 |
WMC8 South of Leigh Road, Wimborne |
N/A |
N/A |
N/A |
350 |
CM1 Lockyer's school & North of Corfe Mullen |
N/A |
N/A |
N/A |
250 |
FWP3 Holmwood House, Ferndown |
2 |
0 |
0 |
150 |
FWP4 Coppins, Ferndown |
Completed 2015 to 2016 |
Completed 2015 to 2016 |
Completed 2015 to 2016 |
40 |
FWP6 East of New Road, West Parley |
N/A |
N/A |
N/A |
320 |
FWP7 West of New Road, West Parley |
N/A |
N/A |
N/A |
150 |
VTSW4 North Western Verwood |
N/A |
N/A |
N/A |
230 |
VTSW5 North Eastern Verwood |
N/A |
N/A |
N/A |
65 |
Total completions |
2 |
0 |
0 |
- |
Table last updated November 2017, using figures collected up to 31 March 2017
Residential completions on new neighbourhoods (Christchurch and East Dorset) 1 April 2017 to 31 March 2018
Strategic objectives 1,2,5 and 7
Policy/neighbourhood | Site dwelling completions | Affordable housing completions | Percentage of affordable as proportion of total site completions | Site housing target |
---|---|---|---|---|
CN1 Christchurch urban extension |
N/A |
N/A |
N/A |
950 |
CN2 South of Burton Village |
N/A |
N/A |
N/A |
45 |
WMC5 Cuthbury allotments and St Margaret's Close |
N/A |
N/A |
N/A |
220 |
WMC6 Stone Lane, Wimborne |
N/A |
N/A |
N/A |
90 |
WMC7 Cranborne Road, Wimborne |
N/A |
N/A |
N/A |
600 |
WMC8 South of Leigh Road, Wimborne |
N/A |
N/A |
N/A |
350 |
CM1 Lockyer's school & North of Corfe Mullen |
N/A |
N/A |
N/A |
250 |
FWP3 Holmwood House, Ferndown |
125 |
62 |
50 |
150 |
FWP4 Coppins, Ferndown |
Completed 2015 to 2016 |
Completed 2015 to 2016 |
Completed 2015 to 2016 |
40 |
FWP6 East of New Road, West Parley |
N/A |
N/A |
N/A |
320 |
FWP7 West of New Road, West Parley |
N/A |
N/A |
N/A |
150 |
VTSW4 North Western Verwood |
N/A |
N/A |
N/A |
230 |
VTSW5 North Eastern Verwood |
N/A |
N/A |
N/A |
65 |
Total completions |
125 |
62 |
50 |
- |
Table last updated January 2019, using figures collected up to 31 March 2018
Housing densities
Policy LN2 of the Local Plan - part 1 encourages provision of a minimum density of 30 dwellings per hectare, in order to make best use of land. The table below shows completions by density across three categories.
Completions by density* - Christchurch and East Dorset
Policy LN2 - minimum density target 30dph unless local character dictates otherwise
Monitoring indicator | 1 April 2012 to 31 March 2013 | 1 April 2013 to 31 March 2014 | 1 April 2014 to 31 March 2015 | 1 April 2015 to 31 March 2016 | 1 April 2016 to 31 March 2017 | 1 April 2017 to 31 March 2018 |
---|---|---|---|---|---|---|
Dwellings completed at less than 30 dwellings per hectare (dph) |
60 |
94 |
93 |
168 |
187 |
208 |
Dwellings completed at 30-49 dph |
23 |
159 |
99 |
54 |
58 |
148 |
Dwellings completed at 50+ dph |
83 |
107 |
142 |
132 |
71 |
67 |
*Excludes C2 -Table last updated January 2019 using figures collected up to 31 March 2018
Housing design (last updated December 2016)
Core Strategy policy LN1 refers to the Homes and Communities Agency Quality Indicators in relation to private open space, unit sizes, layout and accessibility. These standards have since been superseded by new national standards. In future we will need to monitor new development in relation to the delivery of the new standards.
In the limited cases where insufficient internal space has been a key issue, we have applied the minimum internal space standards set out in the Housing and Affordable Housing SPD (page 9 paragraph 3.11). We have in a limited number of cases used the standards to negotiate increased internal space provision or to refuse an application.
Completed Market Housing by Bedroom Number
The tables below relate to market housing and show the number of completions of 1, 2, 3 and 4+ bedroom market dwellings for each year from 1 April 2012 to 31 March 2018, against the SHMA requirements. The 2012 to 2013 requirements (expressed as dwellings per year) are based on the SHMA 2012. The requirements from 2013 onwards are based on the SHMA 2015 and are expressed as a percentage of total market housing completions.
Completions of Market Housing Dwellings (Gross): 1 April 2012 to 31 March 2013* (2012 SHMA requirements – dwellings per annum market completions)
Christchurch:
Number of bedrooms | Completed | SHMA requirements |
---|---|---|
1 bedroom | 25 |
-3 |
2 bedroom | 29 |
60 |
3 bedroom | 22 |
61 |
4+ bedroom | 15 |
13 |
Total | 91 |
131 |
Table last updated November 2016, using figures collected up to 31 March 2013
East Dorset:
Number of bedrooms | Completed | SHMA requirements |
---|---|---|
1 bedroom | 27 |
5 |
2 bedroom | 22 |
87 |
3 bedroom | 17 |
97 |
4+ bedroom | 22 |
12 |
Total | 88 |
201 |
Table last updated November 2016, using figures collected up to 31 March 2013
*SHMA requirements expressed as dwellings per annum, as set out in the Housing and Affordable Housing SPD 2014) page 8 (assuming 40% affordable housing delivery (based on SHMA 2012)
Completions of Market Housing Dwellings (Gross): 1 April 2013 to 31 March 2014 (2015 SHMA requirements - percentage of market completions)
Christchurch:
Number of bedrooms | Dwellings | % of annual market completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 25 |
16.7 |
7.2 |
2 bedroom | 56 |
37.6 |
42.6 |
3 bedroom | 55 |
36.9 |
40.2 |
4+ bedroom | 13 |
8.7 |
10 |
Total Market dwellings (gross) | 149 |
- |
- |
Table last updated November 2016, using figures collected up to 31 March 2014
East Dorset:
Number of bedrooms | Dwellings | % of annual market completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 49 |
22.7 |
8.3 |
2 bedroom | 66 |
30.6 |
48.7 |
3 bedroom | 44 |
20.4 |
43 |
4+ bedroom | 57 |
26.4 |
0 |
Total | 216 |
- |
- |
Table last updated November 2016, using figures collected up to 31 March 2014
Completions of Market Housing Dwellings (Gross): 1 April 2014 to 31 March 2015 (2015 SHMA requirements - percentage of market completions)
Christchurch:
Number of bedrooms | Dwellings | % of annual market completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 59 |
36.2 |
7.2 |
2 bedroom | 63 |
38.7 |
42.6 |
3 bedroom | 24 |
14.7 |
40.2 |
4+ bedroom | 17 |
10.4 |
10 |
Total market dwellings (gross) | 163 |
- |
- |
Table last updated November 2016, using figures collected up to 31 March 2015
East Dorset:
Number of bedrooms | Dwellings | % of annual market completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 10 |
5.8 |
8.3 |
2 bedroom | 51 |
29.7 |
48.7 |
3 bedroom | 52 |
30.2 |
43 |
4+ bedroom | 59 |
34.3 |
0 |
Total market dwellings (gross) | 172 |
- |
- |
Table last updated November 2016, using figures collected up to 31 March 2015.
Completions of Market Housing Dwellings (Gross) by Bedroom Number: 1 April 2015 to 31 March 2016 (2015 SHMA requirements - percentage of market completions
Christchurch:
Number of bedrooms | Dwellings | % of annual market completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 31 |
22.7 |
7.2 |
2 bedroom | 40 |
29.4 |
42.6 |
3 bedroom | 52 |
38.2 |
40.2 |
4+ bedroom | 13 |
9.5 |
10 |
Total market dwellings (gross) | 136 |
- |
- |
Table last updated October 2016, using figures collected up to 31 March 2016.
East Dorset:
Number of bedrooms | Dwellings | % of annual market completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 17 |
7.9 |
8.3 |
2 bedroom | 94 |
43.7 |
48.7 |
3 bedroom | 57 |
26.5 |
43 |
4+ bedroom | 47 |
21.8 |
0 |
Total market dwellings (gross) | 215 |
- |
- |
Table last updated October 2016, using figures collected up to 31 March 2016.
Completions of Market Housing Dwellings (Gross) by Bedroom Number: 1 April 2016 – 31 March 2017 (2015 SHMA requirements - percentage of market completions)
Christchurch:
Number of bedrooms | Dwellings | % of annual market completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 59 |
26.9 |
7.2 |
2 bedroom | 69 |
31.5 |
42.6 |
3 bedroom | 55 |
25.1 |
40.2 |
4+ bedroom | 36 |
16.4 |
10 |
Total market dwellings (gross) | 219 |
- |
- |
Table last updated November 2017, using figures collected up to 31 March 2017.
East Dorset:
Number of bedrooms | Dwellings | % of annual market completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 5 |
3.7 |
8.3 |
2 bedroom | 36 |
27 |
48.7 |
3 bedroom | 27 |
20.3 |
43 |
4+ bedroom | 43 |
32.3 |
0 |
Total market dwellings (gross) | 133 |
- |
- |
Table last updated November 2017, using figures collected up to 31 March 2017.
Completions of Market Housing Dwellings (Gross) by Bedroom Number: 1 April 2017 to 31 March 2018 (2015 SHMA requirements - percentage of market completions)
Christchurch:
Number of bedrooms | Dwellings | % of annual market completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 22 |
20.2 |
7.2 |
2 bedroom | 27 |
24.8 |
42.6 |
3 bedroom | 39 |
35.8 |
40.2 |
4+ bedroom | 21 |
19.3 |
10 |
Total market dwellings (gross) | 109 |
- |
- |
Table last updated January 2019, using figures collected up to 31 March 2018.
East Dorset:
Number of bedrooms | Dwellings | % of annual market completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 4 |
1.6 |
8.3 |
2 bedroom | 48 |
19.4 |
48.7 |
3 bedroom | 105 |
42.5 |
43 |
4+ bedroom | 90 |
36.4 |
0 |
Total market dwellings (gross) | 247 |
- |
- |
Table last updated January 2019, using figures collected up to 31 March 2018.
Completed affordable housing by house size
The tables below relate to affordable housing and show the number of completions of 1, 2, 3 and 4+ bedroom affordable dwellings for each year from 1 April 2012 - 31 March 2018, against the SHMA requirements. The 2012 - 2013 requirements (expressed as dwellings per year) are based on the SHMA 2012. The requirements from 2013 onwards are based on the SHMA 2015 and are expressed as a percentage of total affordable housing completions.
The tables below relate to affordable housing and show the numbers of completions (gross) of 1,2,3 and 4+ bedroom affordable dwellings and shows them as a percentage of total affordable completions against the SHMA percentage requirement.
Affordable housing completions (gross) by bedroom number 1 April 2012 to 31 March 2013 (2012 SHMA requirements)
Christchurch:
Number of bedrooms | Completed | SHMA requirements |
---|---|---|
1 bedroom | 0 |
26 |
2 bedroom | 2 |
35 |
3 bedroom | 2 |
20 |
4+ bedroom | 0 |
6 |
Total | 4 |
87 |
Table last updated November 2016, using figures collected up to 31 March 2013.
East Dorset:
Number of bedrooms | Completed | SHMA requirements |
---|---|---|
1 bedroom | 11 |
31 |
2 bedroom | 9 |
50 |
3 bedroom | 5 |
43 |
4+ bedroom | 0 |
10 |
Total | 25 |
134 |
Table last updated November 2016, using figures collected up to 31 March 2013.
Affordable housing completions (gross) by bedroom number 1 April 2013 to 31 March 2014 (2015 SHMA requirements - percentage of affordable completions)
Christchurch:
Number of bedrooms | Dwellings | % of annual affordable completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 0 |
0 |
46.5 |
2 bedroom | 10 |
50 |
29.8 |
3 bedroom | 10 |
50 |
21.3 |
4+ bedroom | 0 |
0 |
2.4 |
Total | 20 |
- |
- |
Table last updated November 2016, using figures collected up to 31 March 2014
East Dorset:
Number of bedrooms | Dwellings | % of annual affordable completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 2 |
13.3 |
32.5 |
2 bedroom | 5 |
33.3 |
42.3 |
3 bedroom | 5 |
33.3 |
22.8 |
4+ bedroom | 3 |
20 |
2.4 |
Total | 15 |
- |
- |
Table last updated November 2016, using figures collected up to 31 March 2014.
Affordable housing completions (gross) by bedroom number 1 April 2014 to 31 March 2015 (2015 SHMA requirements - percentage of affordable completions)
Christchurch:
Number of bedrooms | Dwellings | % of annual affordable completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 4 |
14.8 |
46.5 |
2 bedroom | 20 |
74.1 |
29.8 |
3 bedroom | 3 |
11.1 |
21.3 |
4+ bedroom | 0 |
0 |
2.4 |
Total | 27 |
- |
- |
Table last updated November 2016, using figures collected up to 31 March 2015
East Dorset:
Number of bedrooms | Dwellings | ‘% of annual affordable completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 4 |
11.1 |
32.5 |
2 bedroom | 14 |
38.9 |
42.3 |
3 bedroom | 11 |
30.6 |
22.8 |
4+ bedroom | 7 |
19.4 |
2.4 |
Total | 36 |
- |
- |
Table last updated November 2016, using figures collected up to 31 March 2015.
Affordable housing completions (gross) by bedroom number 1 April 2015 to 31 March 2016 (2015 SHMA requirements - percentage of affordable completions)
Christchurch:
Number of bedrooms | Dwellings | % of annual affordable completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 2 |
22.2 |
46.5 |
2 bedroom | 6 |
66.6 |
29.8 |
3 bedroom | 1 |
11.11 |
21.3 |
4+ bedroom | 0 |
0 |
2.4 |
Total affordable dwellings: | 9 |
- |
- |
Table last updated October 2016, using figures collected up to 31 March 2016
East Dorset:
Number of bedrooms | Dwellings | % of annual affordable completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 6 |
16.6 |
32.5 |
2 bedroom | 11 |
30.5 |
42.3 |
3 bedroom | 19 |
52.7 |
22.8 |
4+ bedroom | 0 |
0 |
2.4 |
Total affordable dwellings: | 36 |
- |
- |
Table last updated October 2016, using figures collected up to 31 March 2016.
Affordable housing completions (gross) by bedroom number 1 April 2016 to 31 March 2017 (2015 SHMA requirements - percentage of affordable completions)
Christchurch:
Number of bedrooms | Dwellings | % of annual affordable completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 3 |
21.4 |
46.5 |
2 bedroom | 9 |
64.2 |
29.8 |
3 bedroom | 2 |
14.28 |
21.3 |
4+ bedroom | 0 |
0 |
2.4 |
Total affordable dwellings: | 14 |
- |
- |
Table last updated November 2017, using figures collected up to 31 March 2017.
East Dorset:
Number of bedrooms | Dwellings | % of annual affordable completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 12 |
52.17 |
32.5 |
2 bedroom | 11 |
47.8 |
42.3 |
3 bedroom | 0 |
0 |
22.8 |
4+ bedroom | 0 |
0 |
2.4 |
Total affordable dwellings: | 23 |
- |
- |
Table last updated November 2017, using figures collected up to 31 March 2017.
Affordable housing completions (gross) by bedroom number 1 April 2017 to 31 March 2018 (2015 SHMA requirements - percentage of affordable completions)
Christchurch:
Number of bedrooms | Dwellings | % of annual affordable completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 4 |
7.3 |
46.5 |
2 bedroom | 40 |
72.3 |
29.8 |
3 bedroom | 11 |
20 |
21.3 |
4+ bedroom | 0 |
0 |
2.4 |
Total affordable dwellings: | 55 |
- |
- |
Table last updated January 2019, using figures collected up to 31 March 2018.
East Dorset:
Number of bedrooms | Dwellings | % of annual affordable completions | SHMA (%) requirements |
---|---|---|---|
1 bedroom | 34 |
31.8 |
32.5 |
2 bedroom | 36 |
33.6 |
42.3 |
3 bedroom | 32 |
29.9 |
22.8 |
4+ bedroom | 5 |
4.7 |
2.4 |
Total affordable dwellings: | 107 |
- |
- |
Table last updated January 2019, using figures collected up to 31 March 2018.
Affordable completions - green field/brown field
Policy LN3 requires that on greenfield land 50% of housing provided must be affordable housing. All other residential development should include for 40% affordable housing. The tables below show affordable completions as a percentage of total completions for each year from 1 April 2012 to 31 March 2018.
The tables below use residential completions for a given monitoring year, so the percentage represents the proportion of these annual completions rather than a direct representation of the affordable housing percentage for a specific planning permission.
The figures for greenfield are also referred to as non-Previously Developed Land (non-PDL), which includes certain sites on garden land.
1 April 2012 to 31 March 2013 (Christchurch and East Dorset)
Completion type | Affordable housing completions | Total housing completions | Percentage of affordable as proportion of all completions | Target percentage |
---|---|---|---|---|
Greenfield land (including new neighbourhoods) | 0 |
21 |
0 |
up to 50% |
Land within existing urban and village areas (excluding new neighbourhoods) | 26 |
187 |
14 |
up to 40% |
Exception sites (policy LN4) | 0 |
0 |
- |
100% |
Total | 26 |
208 |
13 |
- |
Table last updated November 2016, using figures collected up to 31 March 2013
1 April 2013 to 31 March 2014 (Christchurch and East Dorset)
Completion type | Affordable housing completions | Total housing completions | Percentage of affordable as proportion of all completions | Target percentage |
---|---|---|---|---|
Greenfield land (including new neighbourhoods) | 7 |
53 |
13 |
up to 50% |
Land within existing urban and village areas (excluding new neighbourhoods) | 32 |
147 |
22 |
up to 40% |
Exception sites (policy LN4) | 0 |
0 |
- |
100% |
Total | 39 |
400 |
10 |
35% (policy KS4: i.e 198 affordable dwellings per annum*) |
Table last updated November 2016, using figures collected up to 31 March 2014
1 April 2014 to 31 March 2015 (Christchurch and East Dorset)
Completion type | Affordable housing completions | Total housing completions | Percentage of affordable as proportion of all completions | Target percentage |
---|---|---|---|---|
Greenfield land (including new neighbourhoods) | 0 |
41 |
0 |
up to 50% |
Land within existing urban and village areas (excluding new neighbourhoods) | 63 |
357 |
18 |
up to 40% |
Exception sites (policy LN4) | 0 |
0 |
- |
100% |
Total | 63 |
398 |
16 |
35% (policy KS4: i.e 198 affordable dwellings per annum *) |
Table last updated November 2016, using figures collected up to 31 March 2015
1 April 2015 to 31 March 2016 (Christchurch and East Dorset)
Completion type | Affordable housing completions | Total housing completions | Percentage of affordable as proportion of all completions | Target percentage |
---|---|---|---|---|
Greenfield land (including new neighbourhoods) | 24 |
112 |
21 |
up to 50% |
Land within existing urban and village areas (excluding new neighbourhoods) | 21 |
242 |
9 |
up to 40% |
Exception sites (policy LN4) | 0 |
0 |
- |
100% |
Total | 45 |
354 |
13 |
35% (policy KS4: i.e 198 affordable dwellings per annum *) |
Table last updated October 2016, using figures collected up to 31 March 2016
1 April 2016 to 31 March 2017 (Christchurch and East Dorset)
Completion type | Affordable housing completions | Total housing completions | Percentage of affordable as proportion of all completions | Target percentage |
---|---|---|---|---|
Greenfield land (including new neighbourhoods) | 0 |
58 |
0 |
up to 50% |
Land within existing urban and village areas (excluding new neighbourhoods) | 37 |
372 |
9.94 |
up to 40% |
Exception sites (policy LN4) | 0 |
0 |
- |
100% |
Total | 37 |
430 |
8.6 |
35% (policy KS4: i.e 198 affordable dwellings per annum*) |
Table last updated November 2017, using figures collected up to 31 March 2017.
1 April 2017 to 31 March 2018 (Christchurch and East Dorset)
Completion type | Affordable housing completions | Total housing completions | Percentage of affordable as proportion of all completions | Target percentage |
---|---|---|---|---|
Greenfield land (including new neighbourhoods) | 62 |
154 |
40.1 |
up to 50% |
Land within existing urban and village areas (excluding new neighbourhoods) | 100 |
251 |
39.8 |
up to 40% |
Exception sites (policy LN4) | 0 |
0 |
0 |
100% |
Total | 162 |
405 |
40 |
35% (policy KS4: i.e 198 affordable dwellings per annum*) |
Table last updated January 2019, using figures collected up to 31 March 2018.
*Overall annual housing target (policy KS4) = 8,490 new homes for 2013-2028, which equates to 566 dwellings a year. Therefore the annual affordable housing target = 35% of 566 = 198)
Affordable housing completions by tenure
Local Plan policy LN3 seeks that 30% of affordable housing should be intermediate and 70 % affordable rented or social rented. LN3 also requires that for developments providing for 10 or more affordable homes, 10% of these should be specialised affordable housing, i.e. specially adapted or supported housing). The tables below show delivery against these local plan targets.
1 April 2012 to 31 March 2013 - Affordable housing completions (gross) by tenure
East Dorset:
Housing tenure | Completions | % of affordable | Local plan target - policy LN3 (percentage of affordable completions) |
---|---|---|---|
Specialised affordable housing(i.e. specially adapted or supported affordable rented/social rented housing) | No data |
No data |
10% (applies to developments providing more than 10 affordable homes) |
Affordable /social rented | 25 |
100 |
70% |
Intermediate | 0 |
0 |
30% |
Table last updated November 2016, using figures collected up to 31 March 2013
Christchurch:
Housing tenure | Completions | % of affordable | Local plan target - policy LN3 (percentage of affordable completions) |
---|---|---|---|
Specialised affordable housing(i.e. specially adapted or supported affordable rented/social rented housing) | No data |
No data |
10% (applies to developments providing more than 10 affordable homes) |
Affordable /social rented | 4 |
100 |
70% |
Intermediate | 0 |
0 |
30% |
Table last updated November 2016, using figures collected up to 31 March 2013
1 April 2013 - 31 March 2014 - Affordable housing completions (gross) by tenure
East Dorset
Housing tenure | Completions | % of affordable | Local plan target - policy LN3 (percentage of affordable completions) |
---|---|---|---|
Specialised affordable housing(i.e. specially adapted or supported affordable rented/social rented housing) | No data |
No data |
10% (applies to developments providing more than 10 affordable homes) |
Affordable /social rented | 6 |
40 |
70% |
Intermediate | 9 |
60 |
30% |
Table last updated November 2016, using figures collected up to 31 March 2014
Christchurch
Housing tenure | Completions | % of affordable | Local plan target - policy LN3 (percentage of affordable completions) |
---|---|---|---|
Specialised affordable housing(i.e. specially adapted or supported affordable rented/social rented housing) | No data |
No data |
10% (applies to developments providing more than 10 affordable homes) |
Affordable /social rented | 9 |
45 |
70% |
Intermediate | 11 |
55 |
30% |
Table last updated November 2016, using figures collected up to 31 March 2014
1 April 2014 to 31 March 2015 - Affordable housing completions (gross) by tenure
East Dorset
Housing tenure | Completions | % of affordable | Local plan target - policy LN3 (percentage of affordable completions) |
---|---|---|---|
Specialised affordable housing(i.e. specially adapted or supported affordable rented/social rented housing) | No data |
No data |
10% (applies to developments providing more than 10 affordable homes) |
Affordable rented/social rented | 25 |
69.4 |
70% |
Intermediate | 11 |
30.6 |
30% |
Table last updated November 2016, using figures collected up to 31 March 2015
Christchurch
Housing tenure | Completions | % of affordable | Local plan target - policy LN3 (percentage of affordable completions) |
---|---|---|---|
Specialised affordable housing i.e. specially adapted or supported affordable rented/social rented housing) | No data |
No data |
10% |
Affordable rented/ Social Rented | 22 |
81.5 |
70% |
Intermediate | 5 |
18.5 |
30% |
Table last updated November 2016, using figures collected up to 31 March 2015
1 April 2015 to 31 March 2016 - Affordable housing completions (gross) by tenure
East Dorset
Housing tenure | Completions | % of affordable | Local plan target - policy LN3 (percentage of affordable completions) |
---|---|---|---|
Specialised affordable housing (i.e. specially adapted or supported affordable rented/social rented housing) | 0 |
0 |
10% ( applies to developments providing more than 10 affordable homes) |
Affordable /social rented | 17 |
47.2 |
70% |
Intermediate | 19 |
52.7 |
30% |
Table last updated October 2016, using figures collected up to 31 March 2016
Christchurch
Housing tenure | Completions | % of affordable | Local plan target - policy LN3 (percentage of affordable completions) |
---|---|---|---|
Specialised affordable housing(i.e. specially adapted or supported affordable rented/social rented housing) | 0 |
0 |
10% (applies to developments providing more than 10 affordable homes) |
Affordable rented/social rented | 9 |
100 |
70% |
Intermediate | 0 |
0 |
30% |
Table last updated October 2016, using figures collected up to 31 March 2016
1 April 2016 to 31 March 2017 - Affordable housing completions (gross) by tenure
East Dorset
Housing tenure | Completions | % of affordable | Local plan target - policy LN3 (percentage of affordable completions) |
---|---|---|---|
Specialised affordable housing(i.e. specially adapted or supported affordable rented/social rented housing) | 0 |
0 |
10% ( applies to developments providing more than 10 affordable homes) |
Affordable /social rented | 13 |
56.5 |
70% |
Intermediate | 10 |
43.4 |
30% |
Table last updated November 2017, using figures collected up to 31 March 2017
Christchurch
Housing tenure | Completions | % of affordable | Local plan target - policy LN3 (percentage of affordable completions) |
---|---|---|---|
Specialised affordable housing(i.e. specially adapted or supported affordable rented/social rented housing) | 0 |
0 |
10% (applies to developments providing more than 10 affordable homes) |
Affordable rented/social rented | 14 |
100 |
70% |
Intermediate | 0 |
0 |
30% |
Table last updated November 2017, using figures collected up to 31 March 2017
1 April 2017 to 31 March 2018 - Affordable housing completions (gross) by tenure
East Dorset
Housing tenure | Completions | % of affordable | Local plan target - policy LN3 (percentage of affordable completions) |
---|---|---|---|
Specialised affordable housing(i.e. specially adapted or supported affordable rented/social rented housing) | 0 |
0 |
10% ( applies to developments providing more than 10 affordable homes) |
Affordable /social rented | 75 |
70.1 |
70% |
Intermediate | 32 |
29.9 |
30% |
Table last updated January 2019, using figures collected up to 31 March 2018
Christchurch
Housing tenure | Completions | % of affordable | Local plan target - policy LN3 (percentage of affordable completions) |
---|---|---|---|
Specialised affordable housing(i.e. specially adapted or supported affordable rented/social rented housing) | 0 |
0 |
10% (applies to developments providing more than 10 affordable homes) |
Affordable rented/social rented | 35 |
63.6 |
70% |
Intermediate | 20 |
36.4 |
30% |
Table last updated January 2019, using figures collected up to 31 March 2018
Housing and accommodation for vulnerable people
We have only commenced monitoring provision of use class C2 bed spaces and specialised housing for the elderly (C3) since 1 April 2014. As a consequence the following completions do not include all proposals that were granted planning permission before 1 April 2014 but that may have been completed between 2014 to 2016, so these figures may not reflect the full number of completions.
Net completions of C2 bed spaces
Year | 2014 to 2015 | 2015 to 2016 | 2016 to 2017 | 2017 to 2018 |
---|---|---|---|---|
Christchurch | 0 |
-6 |
80 |
0 |
East Dorset | 0 |
0 |
130 |
-12 |
Total | 0 |
-6 |
210 |
-12 |
Table last updated January 2019, using figures collected up to 31 March 2018
Net completions of specialised housing for the elderly and vulnerable people (use class C3)
2014 to 2015
Units: | Total units | Affordable units |
---|---|---|
Christchurch: | 63 | 0 |
East Dorset: | 0 | 0 |
Total | 63 | 0 |
Table last updated January 2019, using figures collected up to 31 March 2015.
2015 to 2016
Units: | Total units | Affordable units |
---|---|---|
Christchurch: | 0 | 0 |
East Dorset: | 0 | 0 |
Total | 0 | 0 |
Table last updated January 2019, using figures collected up to 31 March 2016.
2016 to 2017
Units: | Total units | Affordable units |
---|---|---|
Christchurch: | 35 | 0 |
East Dorset: | 2 | 0 |
Total | 37 | 0 |
Table last updated January 2019, using figures collected up to 31 March 2017.
2017 to 2018
Units: | Total units | Affordable units |
---|---|---|
Christchurch: | -41 | 0 |
East Dorset: | 2 | 0 |
Total | -39 | 0 |
Table last updated January 2019, using figures collected up to 31 March 2018.
Gypsy and Traveller sites
Christchurch and East Dorset Councils will jointly (with the Dorset Councils) be producing a Dorset-wide Gypsy, Travellers and Travelling Showpeople Sites Development Plan Document. This will identify sites for pitch delivery. The latest Gypsy and Traveller Accommodation Assessment 2017 takes account of changes to the planning definition of a Traveller, and identifies the following revised requirements for Christchurch and East Dorset (with comparison figures from the previous 2013 assessment for ease of reference):
Revised Pitch Requirements for Gypsy & Traveller Accommodation – 2017 GTAA
Requirements: | Meet definition | Unknown | Not meet definition | Total | 2014 GTAA | Difference |
---|---|---|---|---|---|---|
Bournemouth | 0 |
0 |
0 |
0 |
0 |
0 |
Christchurch | 1 |
3 |
5 |
9 |
14 |
-5 |
East Dorset | 5 |
16 |
5 |
26 |
19 |
+7 |
North Dorset | 3 |
24 |
9 |
36 |
38 |
-2 |
Poole | 0 |
1 |
5 |
6 |
18 |
-12 |
Purbeck | 1 |
7 |
9 |
17 |
33 |
-16 |
West Dorset | 5 |
10 |
8 |
23 |
28 |
-5 |
Weymouth & Portland | 0 |
0 |
0 |
0 |
0 |
0 |
Total | 15 |
61 |
41 |
117 |
150 |
-33 |
The following tables show the pattern of pitch provision since 2012/13 and projected pitch requirements based on the 2017 GTAA. For provision from 2018 onwards three figures are shown:
- provision for Travellers who meet the definition
- provision for unknown travellers
- provision for travellers who do not meet the definition
There was very minimal need for Travelling Showpeople accommodation identified in the revised GTAA. One Travelling Showperson was identified in Christchurch but it was not established if they met the planning definition or not. No need for travelling showpeople was identified in East Dorset.
Pitch Provision since 2012 to 2013
Years: | 2012 to 2013 | 2013 to 2014 | 2014 to 2015 | 2015 to 2016 | 2016 to 2017 | 2017 to 2018 |
---|---|---|---|---|---|---|
Christchurch |
0 |
0 |
0 |
0 |
0 |
0 |
East Dorset |
0 |
0 |
0 |
0 |
0 |
0 |
Projected Pitch Provision from 2018 onwards
Christchurch
Years: | 2016 to 2021 | 2021 to 2026 | 2026 to 2031 | 2031 to 2033 | 2033 to 2036 | Total provision |
---|---|---|---|---|---|---|
Travellers who meet the definition |
1 |
0 |
0 |
0 |
0 |
1 |
Provision for unknown Travellers |
2 |
1 |
0 |
0 |
0 |
3 |
Travellers who do not meet the definition |
4 |
0 |
0 |
0 |
1 |
5 |
East Dorset
Years: | 2016 to 2021 | 2021 to 2026 | 2026 to 2031 | 2031 to 2033 | 2033 to 2036 | Total provision |
---|---|---|---|---|---|---|
Travellers who meet the definition |
4 |
0 |
0 |
1 |
0 |
5 |
Provision for unknown Travellers |
13 |
1 |
1 |
0 |
1 |
16 |
Travellers who do not meet the definition |
2 |
1 |
1 |
0 |
1 |
5 |