You may require both Building Control and Planning permission, one or the other or even neither for your project.
Planning permission is normally not needed for:
If your home is listed or in a conservation area, you may need listed building consent.
Planning permission will take at least two months so make sure you leave plenty of time.
Planning look at:
Building Control provide inspections to check the safety and quality of the work to make sure the building will not fall down or burn down. They check that all building works meet the standards set our in the Building Regs. These are not things that are checked by Planning.
If you are still not sure if you need Building Control or Planning permission you should contact us: