Location: Weymouth, Dorset
Project cost: £89,091.87
Grant: £35,636.75
Estimated Savings: 65 tonnes of CO2e*, £16k (£15.5k from solar, £550 from LEDs and £90 from pipe lagging)
Equipment / Installer: 115 kWp of solar PV (Dorset Energy Solutions), Pipe lagging (Wessex Insulation), Exterior LED lighting (Edmundson Electrical Ltd)

Download the Waterside Holiday Group case study as a PDF

Waterside Holiday Group map
 

“Having the chance to work with Low Carbon Dorset has been a fantastic opportunity for our business, and has given us the chance to implement further carbon saving measures that would have taken considerably longer without their considerable knowledge, advice, and support. We very much look forward to working with them again in the near future.”

Justin Smith, Aftersales & Business Compliance Manager – Waterside Holiday Group

*CO2e, or carbon dioxide equivalent, is a term used to describe different greenhouse gases in a common unit. For any quantity and type of greenhouse gas, CO2e signifies the amount of CO2 which would have the equivalent global warming impact. And allows us to express a carbon footprint consisting of lots of different greenhouse gases as a single number.