Location: Gillingham, Dorset
Project cost: £79,469
Grant: £29,667.60
Estimated Savings: 72 tonnes of CO2 per year  / £14K per year*
*calculated by comparing to annual costs of an expanded / improved electric heating system, and takes into account RHI
Equipment / Installer:Biomass heater system with fuel store and buffer tank (Bioheat), two fast-roller loading/unloading doors (Fix A Door)

Download the South West Packaging case study as a PDF

South West Packaging map
 

“The Biomass Boiler has made a world of difference to us.  Not only to our staff, who now enjoy a much more comfortable working environment, but also the knock-on effect to our machinery and the glues we use, making our final product even better! And the green benefits are a huge plus point to our customers too.”

Stuart Tracy, Sales Director, Southwest Packaging